16/1/23
21
Cllr D Faulkner (Chair), Cllr R Kenworthy, Cllr R Read, Cllr C Smith
1 member of the public
Cllr P George
None required
None
The minutes of the meeting were approved and signed by the Chair.
The Chair proposed that Agenda item 8, Public Participation be brought forward
The member of the public gave an update on the beach clean at Ananside. An additional skip was required to remove the remaining waste, plus an additional charge of £4 + vat had been incurred for the tyres disposed of.
Resolved to order the additional skip.
Resolved to write to Trudy Harrison MP, Cllr Andy Pratt, Portfolio holder for waste at Copeland Borough Council re the issue
Letter of thanks to go to farmer who has assisted in the removal of the waste.
Previously circulated.
118/22.1 Speeding
Clerk reported that the Police had agreed to change times for speed checks
118/22.2 EV Charge Point
Clerk to circulate details of another company.
None.
7/2022/4106 Well Farm Barn, Bootle Station,
Construction of a new 1.5 storey room in roof home office/gym with garage under
Supported
7/2022/4100 Well Farm Barn, Bootle Station,
Non-material amendment to planning application 7/2021/4111 (Demolition of existing outbuilding and wood store and the construction of a new 1.5 storey room in roof home office/gym with garage under) to make amendments to approved design, which include door and window positions; constructing a new building similar in scale and appearance in garden northwest of existing outbuilding
For information only
16/1/23
22
The Town and Country Planning (Appeals) (Written Representations Procedure) (England) Regulations 2009 as amended
Reference: 7/2022/4028
Appeal by: Captain’s House Campervans
Site: Captains House, Bootle Station
Supporting information submitted
7/2022/4099 2 Chapel House, Chapel Lane, Bootle,
The removal of the existing single skin blockwork walls, existing asbestos roof panels, existing doors and glazed panels and the installation of new cavity walls, slate roof to match existing, new external doors and 2x conservation rooflights to the existing lean-to side projection. Plus replacement of an existing rotten timber window, with new double glazed timber window painted white
Supported
7/2022/4077 Hyton Farm, Bootle,
The change of use from Agricultural Land to Residential & the construction of a new single storey dwelling adjacent Hayton Farm in Bootle
Granted
7/2022/4088 53 Summer Hill, Bootle,
Construction of a single storey rear extension and the installation of a new driveway, dropped kerb and vehicle cross over.
Granted
7/2022/4083 Millstones Olde Farm House, Bootle,
Non-material amendment to planning application 7/2019/4031 (New house in garden Approved Unconditionally Non material amendments
Valda Energy electric (Direct Debit) £ 108.27
Waterplus water (direct debit) £ 32.14
L Cooper Clerks salary and expenses £ 650.14
HMRC PAYE £ 141.40
SLCC Membership renewal (part) £ 37.00
R Kenworthy Christmas tree lights £ 31.99
Gowan Construction Woodland project £ 324.00
West Cumbria Rivers Trust – Woodland project £ 5396.46
J Nuttall Water heater £ 900.00
JJC Hire Ltd Skip hire £ 385.20
The following invoices were paid Under Financial Standing Orders
Valda Energy Electricity £ 50.82
JJC LTD SKIPS Beach clean up £ 1908.00
HMP HAVERIGG Bird Hide – Woodland project £ 812.75
Waterplus (direct debit) £ 32.14
Waterplus (direct debit) £ 28.59
Proposed by Cllr Kenworthy, Seconded by Cllr Smith
Rent – Church View (Dec) £ 265.00
Rent – Church View (Jan) £ 265.00
Donation boxes £ 10.71
RWM donation for Woodland project £ 16278.95
16/1/23
23
CGP Donation for removal of waste £ 2000.00
Checked and verified by Cllr Kenworthy
The Clerk reported that there were some minor overspends,
To confirm that the Precept application has been submitted
None
The Clerk reported that the water heater had been installed. Drain Cover replacement still outstanding.
A temporary cleaner had been appointed. To advertise for a new cleaner. Old cleaner still yet not relinquished keys.
Awaiting information re defib and status of repairs to door
Grand Opening 17 January 2023
Awaiting final costings to be able to submit final report and request funding from GDF Community Partnership
A valuation has now been received; additional information required.
No Comment
None
All correspondence has been previously circulated. The following had been received:
16/1/23
24
The next meeting to be held at the Community Room Bootle Fire Station on Monday 13 February 2023 at 7.30pm.
There being no other business the Meeting closed at 2115 hrs