BOOTLE PARISH
ANNUAL PARISH MEETING
HELD ON 22 MAY 2024 AT 7.30PM AT CAPTAIN SHAWS SCHOOL, BOOTLE
P1 Present: 19 members of the public were present
P2 Mrs Lesley Cooper was elected as Clerk for the meeting
P3 Chairman’s Report
P4 Woodland Project
Cllr Kenworthy explained the project, how the school were involved in its development and are still actively involved. The PC has a budget for maintenance. It is open to everyone including dogs but we just ask that they are kept on leads and owners pick up after their dogs.
P5 BDSSA Project
Cllr Kenworthy gave an update. The current pavilion is past its sell by date. Surveys and plans have been drawn up and a planning application will shortly be submitted, The PC is holding the funds for the project.
P6 Bootle in Bloom
Brenda Hill gave a report. Since 2016 apart from 2 years that not entered in Cumbria in Bloom, the village has been awarded a gold each year. There is a small team of volunteers and looking for more. Most pots have now been replaced with self watering pots.
Looking for volunteers for 5 June when planting begins. Looking for a small wheelbarrow for this season if someone could loan one. Now responsible for the station area which now has bird boxes, trees, flowers and a bug hotel.
Could everyone be responsible for their own kerb frontage pulling out weeds etc.
This year’s judging is first 2 weeks in July.
Asked if the road sweeper could come through the village occasionally. Cllr Pratt to investigate.
P7 WI
A representative of the WI stated that the WI would be 100 years old in 2025 and asked if a raised flower bed with “welcome to Bootle” could be made. Gary Gowan would provide sleepers and bricks necessary.
WI had organised the coronation and children’s parties.
P8 Over 60’s Club
A trip has been organised 10 July to Hexham and the club is currently fund raising..
P9 Bootle Station Village Hall
A representative stated that they had received a grant of £50k from GF to replace the obsolete play equipment, plus donations from local businesses/companies.. They had an open evening for children to seek their opinion on what equipment they wanted. It is hoped that installation will commence 3 June and be finished by 3 week in June after which they will hold an Opening event.
P10 Wellbank
A representative of the developers gave an update on the project. 1st phase is 18 “self build” houses to be built, plus 8 self-catering accessible accommodation cottages for Brickhouse Cottages and a Community Hub which will contain a swimming pool, hydro pool and rental spaces. Eventually there ill be 50 houses on the site including 8 mixed affordable housing units.
It is hoped that the Brickhouse Cottages and the hub will be build by 2025.
Working with the PC re the footpath..
P11 Comments from the floor
.Meeting closed 9.30pm
Choose which cookies you are happy for us to use. You can change your mind at any time from the Cookie settings button.
Needed for the website to work and to keep it secure, for example remembering your cookie choices, keeping a basket or booking together and protecting forms from spam. These are always on.
Remember choices you make, such as how a list is displayed, so the site works the way you prefer.
Help us understand how visitors use the website so we can improve it.
Used by third-party services such as maps, videos and social media, which may track you across other websites.